PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Derrick -3 Facing East (800x600).jpg Erecting Derrick -3 Facing South (800x600).jpg Excavating in order to install conduit Facing South (800x600).jpg Installing PVC Pipe for Temporary Power Facing South (800x600).jpg Stripping the forms along column line 6.5 (G-C.7) Facing South-East (800x600).jpg Derrick -3 Facing North (800x600).jpg Excavation at Room 173 Facing North-East (800x600).jpg Installing conduit for temporary power Facing South-West (800x600).jpg Installing layout for the wall forms along column line 6.5 (G-C.7) Facing South-West (800x600).jpg
Previous pageNext page Stripping the forms along column line 6.5 (G-C.7) Facing South-East (800x600)
Stripping the forms along column line 6.5 (G-C.7) Facing South-East (800x600)